| Notice Text: |
|
Marshfield Capacity Reduction (Update 9/18/17) This posting supersedes PSO ID #8283
Update: ANR extended the planned pipeline maintenance near the Marshfield Compressor Station in the Northern Area (Zone7). For the period of September 18th through October 5th, 2017, ANR will be limiting the receipt point capacity to 180-MMcf/d at the Marshfield/Viking Interconnect (DRN #28873). Based on current nominations, it is anticipated that this posting will result in the capacity allocation reduction of IT and Firm Secondary volumes. This posting will be updated as more information becomes available.
For any questions regarding nominations or scheduling, please call the ANR Noms and Scheduling Hotline at:
1-800-827-5267
Please contact System Operations with any questions regarding operations or facilities. Monica Edwards 832-320-5822 Operations Control Howard Earl 832-320-5855 Gas Control |
|