Critical Notice

TSP:006958581
TSP Name:ANR Pipeline Company

Notice Type Desc: Maint
Posting Date/Time: 09/13/2017 14:10
Notice Effective Date/Time: 09/13/2017 14:10
Notice End Date/Time: 10/20/2017 08:59
Notice ID: 8303
Notice Status Desc: Supersede
Prior Notice: 8282
Reqrd Rsp: 5
Rsp Date/Time:  
Subject: Michigan Leg South Capacity Reduction (Update 9/13/17) Update: ANR will begin planned pipeline maintenance near the St. John Compressor Station. Crown Point/NIPSCO, DRN # 138744, shut in from October 10th through 19th. (See PSO ID #8303)
Notice Text:
Michigan Leg South Capacity Reduction (Update 9/13/17)
This posting supersedes PSO ID #8292

ANR will begin planned pipeline maintenance near the St. John Compressor Station along its Michigan Leg South located in the Northern Area (Zone 7). The total St. John Eastbound, DRN #226633, capacity will be reduced by the following:

75-MMcf/d (leaving 1,206-MMcf/d available) 9/13 - 10/9
720-MMcf/d (leaving 561-MMcf/d available) 10/10 - 10/14
420-MMcf/d (leaving 861-MMcf/d available) 10/15 - 10/19

From October 10th through 19th, the Crown Point/NIPSCO delivery point, DRN #138744, will be shut in and ANR will not schedule any nominations.

Based on current nominations, it is anticipated that this posting will result in the capacity allocation reduction of IT, Firm Secondary and likely a portion of Firm Primary volumes. Since ANR anticipates that this restriction may impact its ability to deliver all nominated Firm Primary services, ANR will apply the Reservation Charge Crediting Mechanism of Section 6.36.4 as necessary. This posting will be updated as more information becomes available.

For any questions regarding nominations or scheduling, please call the ANR Noms and Scheduling Hotline at:

1-800-827-5267

Please contact System Operations with any questions regarding operations or facilities.
Monica Edwards 832-320-5822 Operations Control
Howard Earl 832-320-5855 Gas Control