Notice Text: |
|
Michigan Leg South Capacity Reduction (Posted 5/30/17)
New: ANR will begin planned pipeline maintenance near the St. John Compressor Station along its Michigan Leg South located in the Northern Area (Zone 7). The total St. John Eastbound (formerly the St. John (W-E) CFTP) DRN #226633, capacity will be reduced by the following:
70-MMcf/d (leaving 1,211-MMcf/d available) 6/12 - 6/30
Based on current nominations, it is anticipated that this posting will result in the capacity allocation reduction of IT and Firm Secondary volumes. This posting will be updated as more information becomes available.
For any questions regarding nominations or scheduling, please call the ANR Noms and Scheduling Hotline at:
1-800-827-5267
Please contact System Operations with any questions regarding operations or facilities. Monica Edwards 832-320-5822 Operations Control Howard Earl 832-320-5855 Gas Control |
|