Critical Notice

TSP:006958581
TSP Name:ANR Pipeline Company

Notice Type Desc: Other
Posting Date/Time: 12/01/2016 13:15
Notice Effective Date/Time: 12/01/2016 13:15
Notice End Date/Time: 04/15/2017 15:10
Notice ID: 7938
Notice Status Desc: Supersede
Prior Notice: 7746
Reqrd Rsp: 5
Rsp Date/Time:  
Subject: Midwest Market Access Project Capacity Reservation (Updated 12/01/2016)
Notice Text:
December 01, 2016
Reservation of Capacity Posting

Pursuant to Section 6.3.3 of the General Terms and Conditions of its FERC Gas Tariff, ANR Pipeline Company (ANR) gives notice that Unsubscribed Capacity, as more fully described below, will be reserved for use in a future expansion of ANR's system. The Midwest Market Access Project (the "Project") is being proposed to construct and modify certain pipeline and compression equipment and other ancillary facilities to provide additional firm transportation service to parties wishing to transport natural gas volumes from receipt points along ANR's Southeast Mainline System between the REX Shelbyville Interconnect and Defiance, Ohio to delivery points in ANR's ML-7 rate zone. ANR originally held a non-binding open season in April 2015 to solicit interest in the Project. Subsequent customer interactions have indicated there is interest in proceeding with the Project with a proposed in-service date of November 1, 2020. ANR anticipates holding another open season in the near future to firm up Project Support.

ANR is reserving annual transportation capacity as more fully described below for the following segment:

81,149 Dth/day SEML(NORTH OF REX)-CFTP (LOC ID 9505527)
213,994 Dth/day MLS BRIDGMAN-SANDWICH (LOC ID 1293229)

As of the date of this posting, none of this reserved capacity has been sold on a limited-term (interim) basis that would otherwise be eligible for a right of first refusal. ANR will be making this capacity available for sale on a limited term basis starting from the date of this posting to the projected in-service date of the Project described above. If any of this reserved capacity is sold on a limited-term basis that would otherwise be eligible for a right of first refusal or if there are any material changes in the scope of the expansion project, ANR will update this posting accordingly.