Notice Text: |
|
Southwest Mainline Capacity Reduction (Updated 8/31/16) This notice supersedes posting #7824
ANR continues planned compressor at various compressor stations along its SWML in the Southwest Fuel Segments (ML-5 and ML-6). Additionally, planned pipeline maintenance is posted for the same Southwest Fuel Segments, which will reduce the total SWML - CFTP (DRN#226630) capacity by the following:
90-MMcf/d (leaving 569-MMcf/d available) 8/31 - 9/2 30-MMcf/d (leaving 629-MMcf/d available) 9/3 - 9/12 90-MMcf/d (leaving 569-MMcf/d available) 9/13 30-MMcf/d (leaving 629-MMcf/d available) 9/14 - 9/18 90-MMcf/d (leaving 569-MMcf/d available) 9/19 - 9/20 130-MMcf/d (leaving 529-MMcf/d available) 9/21 - 9/27 90-MMcf/d (leaving 569-MMcf/d available) 9/28 - 9/30
Based on current nominations through the SWML, it is anticipated that the above reductions may result in the curtailment of IT and Firm Secondary nominations. This posting will be updated as more information becomes available.
For any questions regarding nominations or scheduling, please call the ANR Noms and Scheduling Hotline at:
1-800-827-5267
Please contact System Operations with any questions regarding operations or facilities. Paul Oliver 832-320-5885 Operations Control Howard Earl 832-320-5855 Gas Control |
|