Notice Text: |
|
CAPACITY REDUCTION - Southeast Area - Patterson Compressor Station (Posted: 8/12/25)
The notice below was inadvertently removed from the EBB and this new notice serves only to make it visible again. There are no changes to the posting and the 7-day average was established on 8/11 as stated in Notice #12504.
***Original Posting*** ANR has maintenance at the Patterson Compression Station in the Southeast Area. ANR anticipates this posting may result in Firm Primary, Firm Secondary and Interruptible curtailments. As a result, capacity will be reduced as follows:
8/14/2025: Patterson/Trunkline (LOC #40317): 94 MMcf/d (leaving 0 MMcf/d) Patterson to Col Gulf (LOC #43613): 143 MMcf/d (leaving 0 MMcf/d) Riverway (To Bridgeline) (LOC #42593): 160 MMcf/d (leaving 90 MMcf/d) Avalon (LOC #38295): 60 MMcf/d (leaving 50 MMcf/d) Shadyside/Sonat (Del) (LOC #10369): 317 MMcf/d (leaving 160 MMcf/d) Shadyside/TGP (Del) (LOC #467240): 413 MMcf/d (leaving 30 MMcf/d) St. Landry/FL Int (LOC #322625): 99 MMcf/d (leaving 0 MMcf/d) Weeks ISLA/LIG PL (LOC #233620): 210 MMcf/d (leaving 100 MMcf/d)
Any reservation charge credits (RCCs) will be determined per the process set forth in the General Terms and Conditions, Section 6.36 of ANR's FERC Gas Tariff ("Tariff"). However, ANR will only issue RCCs if ANR is unable to schedule or deliver primary firm nominated capacity as a result of the outage. In the event RCCs are issued as set forth in the Tariff, shippers will receive RCCs based on its 7-day Non-Force Majeure Average Usage Quantity, as defined in Section 6.36.2 of ANR's Tariff, less any scheduled quantities on the contract.
Please direct any questions to your Account Coordinator, Customer Service Representative, or the Nominations and Scheduling hotline @ 800-827-5267
|
|