Notice Text: |
|
CAPACITY REDUCTION - Southeast Area - Patterson Compressor Station (Posted: 6/23/25) ANR has planned maintenance at the Patterson Compression Station in the Southeast Area. ANR anticipates this posting may result in Firm Primary, Firm Secondary and Interruptible curtailments. As a result, capacity will be reduced as follows:
7/9/2025: Patterson/Trunkline (LOC #40317): 94 MMcf/d (leaving 0 MMcf/d) Patterson to Col Gulf (LOC #43613): 143 MMcf/d (leaving 0 MMcf/d) Riverway (To Bridgeline) (LOC #42593): 250 MMcf/d (leaving 10 MMcf/d) Avalon (LOC #38295): 110 MMcf/d (leaving 0 MMcf/d) Shadyside/Sonat (Del) (LOC #10369): 443 MMcf/d (leaving 110 MMcf/d) Shadyside/TGP (Del) (LOC #467240): 413 MMcf/d (leaving 30 MMcf/d) St. Landry/FL Int (LOC #322625): 55 MMcf/d (leaving 44 MMcf/d) Weeks ISLA/LIG PL (LOC #233620): 298 MMcf/d (leaving 12 MMcf/d)
Any reservation charge credits (RCCs) will be determined per the process set forth in the General Terms and Conditions, Section 6.36 of ANR's FERC Gas Tariff ("Tariff"). However, ANR will only issue RCCs if ANR is unable to schedule or deliver primary firm nominated capacity as a result of the outage. In the event RCCs are issued as set forth in the Tariff, shippers will receive RCCs based on its 7-day Non-Force Majeure Average Usage Quantity, as defined in Section 6.36.2 of ANR's Tariff, less any scheduled quantities on the contract. By means of this notice, ANR is establishing which specific Gas Days will be included when determining a shipper's 7-day Non-Force Majeure Average Usage Quantity pursuant to Section 6.36.2(b) of the Tariff.
Please direct any questions to your Account Coordinator, Customer Service Representative, or the Nominations and Scheduling hotline @ 800-827-5267
|
|