Subject: CAPACITY REDUCTION Wisconsin - Marshfield Viking (Posted: 3/10/25)
Notice Text:
CAPACITY REDUCTION Wisconsin - Marshfield Viking (Posted: 3/10/25)

ANR has planned pipeline maintenance in Wisconsin. As a result, capacity will be reduced as follows:

4/7 - 7/31 Marshfield/Viking INT (LOC #28873) ANR will limit net Receipts to 160 MMcf/d

No physical deliveries will be allowed during the planned maintenance. ANR may net delivery nominations against receipt nominations provided the net receipt is in excess of 30 MMcf/d.

ANR anticipates this posting may result in Firm Primary, Firm Secondary and Interruptible curtailments. Estimated impact to Firm Primary as follows:
0% - Based on the Current Net Shipper Nominations
100% - Based on the Current Contracted MDQ


Any reservation charge credits (RCCs) will be determined per the process set forth in the General Terms and Conditions, Section 6.36 of ANR's FERC Gas Tariff ("Tariff"). However, ANR will only issue RCCs if ANR is unable to schedule or deliver primary firm nominated capacity as a result of the outage. In the event RCCs are issued as set forth in the Tariff, shippers will receive RCCs based on its 7-day Non-Force Majeure Average Usage Quantity, as defined in Section 6.36.2 of ANR's Tariff, less any scheduled quantities on the contract. By means of this notice, ANR is establishing which specific Gas Days will be included when determining a shipper's 7-day Non-Force Majeure Average Usage Quantity pursuant to Section 6.36.2(b) of the Tariff.