Subject: Wisconsin West Area Project Reservation of Capacity
Notice Text:
March 3, 2023

Pursuant to Section 6.3.3 of the General Terms and Conditions of its FERC Gas Tariff Third Revised Volume No. 1, as amended from time to time ("Tariff"), ANR Pipeline Company ("ANR") gives notice that it has elected to reserve available, unsubscribed capacity, as more fully described below, for use in a future expansion project on the ANR pipeline system.

The Wisconsin West Area Project (the "Project") is being designed to modify and/or upgrade certain compressor station facilities, certain mainline piping segments, and other appurtenant facilities located within ANR's ML-7 zone. The Project seeks to provide incremental firm capacity for the transport of natural gas volumes from ANR's Marshfield/Viking interconnect to certain delivery points in the State of Wisconsin. The anticipated in-service date of the Project is November 1, 2026.

As a result, ANR is reserving transportation capacity for the Project as more fully described ("Reserved Capacity") below for the following locations and segments:

starting November 1, 2026, during the period of November 1 - October 31, annually:

MARSHFIELD EASTBOUND (Loc ID 505670)
36,175 Dth/day

The Reserved Capacity and scope of the Project may change based upon continued negotiations with potential shippers and the results of any potential, subsequent open season. As of the date of this posting, none of the Reserved Capacity has been sold on a limited-term (interim) basis that would otherwise be eligible for a right of first refusal.

Subject to its availability, ANR will be making this capacity available for sale on a limited term basis starting from the date of this posting to the in-service date of the Project. Any limitations on extension rights that will apply to such reserved capacity that is sold on a limited-term basis that would otherwise be eligible for a right of first refusal will be indicated on ANR's Internet site under Informational Postings listing Unsubscribed Capacity. If there are any material changes in the scope of the Project, ANR will update this posting accordingly. ANR anticipates commencing an open season for the Project by the 4th quarter 2023.